- Zhuo Main Canal: 317 m
- Parallel irrigation canal: 347.4 m
- Sankuaicuo Bridge reconstruction: 1 bridge
- Farm road widening: 134 m
- Flood prevention road (6 m width): 183 m
I. Project Innovation
1. Through detailed land surveys and site inspections, the project makes full use of the limited available land area. In addition to meeting the basic design objectives of rehabilitating aging channels and patrol roads, a linear multi-functional storage basin was incorporated into the design.
Water storage: During normal conditions, the facility stores surplus water during off-peak nighttime hours, reducing water waste.
Sediment settling: By functioning as a stilling basin, it reduces sediment content in irrigation water, thereby decreasing sediment deposition in downstream channels and lowering maintenance and management costs.
Flood detention: During heavy rainfall events, the facility stores floodwater from upstream runoff that would otherwise overflow into the Zhuo Main Canal, reducing the load on downstream waterways, lowering the risk of overtopping, and enhancing regional flood mitigation and detention capacity.
Regulation: Stored water can be used for irrigation allocation, improving water supply stability and overall efficiency of water resource use.
II. Project Challenges
1. The Zhuo Main Canal serves an irrigation area of 38,700 hectares. Maintaining existing irrigation demand during construction and ensuring that irrigation water supply was not affected represented a major challenge. During the planning stage, construction was phased by sections using adjacent available land to laterally relocate and construct a new Zhuo Main Canal. Connection between the new and existing channels was then completed during short irrigation shutdown periods. This approach enabled the canal reconstruction to be completed without interrupting irrigation supply.
2. The project area contains numerous and complex aboveground and underground pipelines. Proactive coordination and collaboration with the relevant pipeline authorities were undertaken in advance to achieve mutually beneficial outcomes.
3. Sankuaicuo Bridge serves as a primary access route for some local residents. Prior to construction, multiple rounds of communication and coordination were conducted with the local community, and alternative routes were properly arranged, allowing the project to be completed on schedule.
III. Project Comprehensiveness
1. While ensuring structural safety, the storage basin and the main canal were designed with a shared wall structure, reducing costs and land requirements while expanding the storage basin capacity and enhancing overall effectiveness.
2. During the planning and design phase, full consideration was given to local environmental conditions and community input. A newly constructed 6-meter-wide patrol road was designed to serve both inspection and maintenance needs as well as local traffic. In sections where the route runs parallel to existing farm roads, a combined structure was adopted to form a 9-meter-wide roadway, improving accessibility and convenience of the existing farm roads while saving 3 meters of land, which was used to increase the width and capacity of the storage basin.
I. Outstanding Project Performance
1. During construction, close attention was given to finishing details to enhance overall project quality and integrity. Strict requirements were applied during the setting-out stage. Both curved and straight sections were executed to consistent quality standards, improving visual comfort.
2. Occupational safety and health education and training, as well as safe construction practices, were fully implemented. No construction safety incidents occurred during the project period.
3. Good neighbor relations were actively maintained throughout construction, and no public supervision reports were filed during the project period.
4. Project quality and schedule were well managed, and the project received a Grade A rating in engineering supervision by the competent authority.
II. Significant Project Benefits
1. Direct Benefits
According to the Zhuo Main Canal Improvement Planning Report, following the improvement of the entire 32,914-meter canal, annual conveyance losses along the main canal can be reduced by approximately 48.15 million metric tons. Following improvements to 317 meters of the canal, seepage losses are reduced by approximately 460,000 metric tons per year.
Upon completion of the Zhuo Main Canal’s Multi-Functional Storage Basin Project, an additional 187,000 metric tons of storage capacity will be created. When operated in conjunction with the downstream Zhuo Main Canal storage basin (96,000 metric tons) and the Anqing Canal storage basin (20,000 metric tons), overall water resource utilization efficiency will be significantly enhanced.
2. Indirect Benefits
The project provides multiple functions, including water storage, sediment settling, flood detention, and flow regulation.
By stabilizing irrigation water supply, the project reduces farmers’ reliance on groundwater extraction, effectively mitigating land subsidence, lowering pumping costs for both the agency and farmers, and reducing carbon emissions associated with energy consumption.
More stable irrigation water supply improves farming conditions, benefiting an estimated 37,080 hectares of agricultural land, increasing farmers’ income, and contributing to rural prosperity.
The project also helps advance the vision of rural revitalization, enabling the public to better understand and appreciate the government’s commitment to supporting agriculture and promoting the benefits of irrigation encompassing production, life, and ecology.
Public Transportation
Take the Taiwan High Speed Rail to Yunlin Station.
Transfer to the THSR shuttle bus and get off at the Chifa Mazu Temple stop.
Proceed south along Guoxi Road (Yun 75 County Road).
Walk for approximately 30 minutes.
By Car
Coordinates: 120.471257, 23.719416
Exit National Highway No. 1 at the Huwei Interchange (southbound Exit 235, northbound Exit 236).
Proceed along Provincial Highway 145B toward THSR Yunlin Station.
Continue south along Guoxi Road (Yun 75 County Road) to reach the filming location.