{"result":true,"data":[{"name":"Reinforcement Works for the Wugu Irrigation Canal and Related Canals","design":null,"organizer":"Northern Keelung Management Office, Agency of Irrigation and Farmland, Ministry of Agriculture","supervision":null,"contract":null,"startTime":"2025-01-25T00:00:00","endTime":"2025-06-25T00:00:00","content":"","innovation":"","good":"","transportation":"","contact":"","picList":[{"picName":"五股圳貼著山壁蜿蜒延伸，清水在灰白圳道中流動。 林蔭濃密、岩石環繞，景致幽靜而有力量。","picURL":"https://www.ia.gov.tw/en/fapi/ArtPic?id=37209\u0026type=EngineeringPic\u0026w=1280\u0026h=720"}]},{"name":"Lining Improvement Project for North Main Canal (4K\u002B490~4K\u002B685)","design":null,"organizer":null,"supervision":null,"contract":null,"startTime":"2022-11-02T00:00:00","endTime":"2023-04-14T00:00:00","content":"Due to the displacement of the canal along the 4K\u002B490 to 4K\u002B685 section of the North Main Canal, the lining has been damaged and is experiencing severe leakage. To ensure the safety of water delivery, reduce water loss from leakage, and prevent downstream irrigation from being affected by canal damage, this project was proposed. 1. Construction of a 195-meter inverted E-shaped channel. 2. Installation of one minor turnout gate. ","innovation":"","good":"","transportation":"","contact":"","picList":[{"picName":"北幹線倒E-空拍(中)","picURL":"https://www.ia.gov.tw/en/fapi/ArtPic?id=34062\u0026type=EngineeringPic\u0026w=1280\u0026h=720"}]},{"name":"Dahu Township Yayou Canal Road Improvement Project","design":null,"organizer":"Miaoli Management Office, Irrigation Agency","supervision":null,"contract":null,"startTime":"2022-08-01T00:00:00","endTime":"2022-12-28T00:00:00","content":"The Yayou Canal in Dahu Township had severely deteriorated due to long-term lack of maintenance, leading to serious leakage issues and inadequate maintenance of irrigation channel walkways. This resulted in water shortages, leaks, and dangerous conditions for farmers during irrigation and canal inspections. To effectively maintain smooth irrigation while preserving biodiversity and avoiding habitat destruction, the project aimed to improve drainage canal facilities. This included implementing green energy generation and a remote-controlled automatic sediment discharge system to reduce manual dredging efforts by farmers while maintaining the canal\u0026#39;s irrigation function. ","innovation":"","good":"","transportation":"","contact":"","picList":[{"picName":"大湖鄉雅悠圳路改善工程","picURL":"https://www.ia.gov.tw/en/fapi/ArtPic?id=34057\u0026type=EngineeringPic\u0026w=1280\u0026h=720"}]},{"name":"Xiaojian No. 1 Canal Improvement Project - Phase I","design":null,"organizer":null,"supervision":null,"contract":null,"startTime":"2023-01-09T00:00:00","endTime":"2023-03-09T00:00:00","content":"Main Construction Items: 1. Wet Stone Masonry on Right Bank: 176.4 meters 2. Stone Lined on Left Bank: 183.7 meters 3. Dry Stone Masonry: 17.5 meters 4. Protective Works: 20 locations 5. Passages: 2 locations 6. Visual Features: 1 location ","innovation":"","good":"","transportation":"","contact":"","picList":[{"picName":"小梘一圳","picURL":"https://www.ia.gov.tw/en/fapi/ArtPic?id=34038\u0026type=EngineeringPic\u0026w=1280\u0026h=720"}]},{"name":"Tianliaoyang Canal No. 1, 2, and 3 Water Intake Facility Renewal and Improvement Project","design":null,"organizer":null,"supervision":null,"contract":null,"startTime":"2023-01-03T00:00:00","endTime":"2023-05-27T00:00:00","content":"Main Construction Items: Partial removal of 6 ground sills, surface roughening of 1 ground sill, and removal of 4 ground sills. Filling and stabilization of 5 riffle zones, covering 22 sections totaling 106 meters; filling of footings with 201.32 m³. Removal of 330.47 m² of gabion structures. Construction of 4 stone beam structures, totaling 70 meters. Construction of 2 masonry spur dikes. Partial retention of 5 ground sills using spur dikes. Installation of 1 irrigation sluice gate. Installation of 1 set of subsurface water intake facilities. Installation of 1 set of subsurface water conveyance facilities. Installation of 1 water guide pipe shaft. Installation of 1 water intake pipe connecting Canal No. 1 and No. 2, totaling 42 meters. Construction of 132 meters of concrete debris retaining walls and linings for Canal No. 2. Installation of 1 sedimentation pond and wildlife corridor for Canal No. 1. Installation of 1 stilling basin and wildlife corridor for Canal No. 2. Construction of a 75-meter full-section fishway. ","innovation":"","good":"","transportation":"","contact":"","picList":[{"picName":"改善後魚類洄游得改善、一堰","picURL":"https://www.ia.gov.tw/en/fapi/ArtPic?id=34012\u0026type=EngineeringPic\u0026w=1280\u0026h=720"}]},{"name":"Improvement Project for Taoyuan Main Canal Pond No. 4-7","design":null,"organizer":"Irrigation Agency, Miniistry of Agriculture","supervision":null,"contract":null,"startTime":"2022-07-16T00:00:00","endTime":"2023-01-11T00:00:00","content":"The ponds of the Taoyuan Main Canal serve critical functions such as water storage, drainage, flood detention, and ecological support. They also revitalize 22,000 hectares of farmland. For a century, this system has played a crucial role in sustaining agriculture, industrial and commercial development, and supporting the region\u0026#39;s vital functions. Pond No. 4-7 of the Taoyuan Main Canal has been in use for over 20 years. The existing lining had deteriorated, causing maintenance difficulties and water retention issues, which necessitated the current improvement project. Main Works: Pond revetment: 1,368 meters 1 water supply tower 1 sluice gate ","innovation":"","good":"","transportation":"","contact":"","picList":[{"picName":"54103_0","picURL":"https://www.ia.gov.tw/en/fapi/ArtPic?id=33983\u0026type=EngineeringPic\u0026w=1280\u0026h=720"}]},{"name":"Zhuo Main Canal (28K\u002B494 ~ 32K\u002B804) Improvement Project - Section 2","design":null,"organizer":"Yunlin Management Office, Irrigation Agency","supervision":null,"contract":null,"startTime":"2023-01-22T00:00:00","endTime":"2023-11-17T00:00:00","content":" Zhuo Main Canal: 872.5 meters. Parallel Waterway: 835 meters. Flood Control Road: 854.5 meters. Bicycle Path Paving Optimization and Greening: 863.5 meters. ","innovation":"","good":"","transportation":"","contact":"","picList":[{"picName":"濁幹線(28K\u002B494~32K\u002B804)改善工程-第二工區8預備-空拍二工區-全景","picURL":"https://www.ia.gov.tw/en/fapi/ArtPic?id=33984\u0026type=EngineeringPic\u0026w=1280\u0026h=720"}]},{"name":"Zhuo Main Canal (28K\u002B494 ~ 32K\u002B804) Improvement Project - Section 3","design":null,"organizer":"Yunlin Management Office, Irrigation Agency","supervision":null,"contract":null,"startTime":"2023-01-31T00:00:00","endTime":"2023-11-26T00:00:00","content":"1. Main Channel’s Rectangular Ditch: 1,050.5 meters. 2. Crossover Bridge and Culvert: 1 unit. 3. Bicycle Path Paving and Greening: 1,050.5 meters. 4. Sluice Gate: 1 unit. ","innovation":"","good":"","transportation":"","contact":"","picList":[{"picName":"濁幹線(28K\u002B494~32K\u002B804)改善工程-第三工區_空拍全景1","picURL":"https://www.ia.gov.tw/en/fapi/ArtPic?id=33992\u0026type=EngineeringPic\u0026w=1280\u0026h=720"}]},{"name":"Soil and Water Conservation Improvements at Puli Dapingding Detention Pond","design":null,"organizer":"Nantou Management Office","supervision":null,"contract":null,"startTime":"2020-10-26T00:00:00","endTime":"2021-05-12T00:00:00","content":"This project focuses on the storage basin intended to support the future expansion of water supply services for the Dapingding irrigation area. Improvement works were carried out in accordance with the Technical Specifications for Soil and Water Conservation to comprehensively strengthen soil and water conservation measures, ensure the safe use of hillside land, and reduce environmental impacts. The scope of work for this project is summarized as follows: Sediment settling and flood detention basin: 1 unit Drainage ditch: 480 m Drainage culverts: 316 m Retaining walls: 40 m Type A catch wells: 3 units; Type B catch wells: 2 units; Type C catch well: 1 unit Overflow well: 1 unit; plunge well: 1 unit; connection structures: 2 units; connection box culvert: 1 unit Vegetation works: 6,291 m² ","innovation":"","good":"","transportation":"","contact":"","picList":[{"picName":"埔里大坪頂調蓄持水土保持改善工程","picURL":"https://www.ia.gov.tw/en/fapi/ArtPic?id=18181\u0026type=EngineeringPic\u0026w=1280\u0026h=720"}]},{"name":"Zhuo Main Canal’s Multi-Functional Storage Basin Project (Phase I)","design":null,"organizer":"Yunlin Management Office","supervision":null,"contract":null,"startTime":"2020-07-12T00:00:00","endTime":"2021-08-09T00:00:00","content":" Zhuo Main Canal: 257.6 m; connection section: 29.6 m Check gate (including control room): 1 unit Water release gate and intake gate: 1 unit each Flood prevention road (5 m width): 303 m Parallel Lenei Branch Canal: 280 m ","innovation":"","good":"","transportation":"","contact":"","picList":[{"picName":"濁幹線多功能調蓄池工程(第一期)-完工空拍","picURL":"https://www.ia.gov.tw/en/fapi/ArtPic?id=18175\u0026type=EngineeringPic\u0026w=1280\u0026h=720"}]},{"name":"Zhuo Main Canal’s Multi-Functional Storage Basin Project (Phase II)","design":null,"organizer":"Yunlin Management Office","supervision":null,"contract":null,"startTime":"2020-07-05T00:00:00","endTime":"2021-08-09T00:00:00","content":" Zhuo Main Canal: 317 m Parallel irrigation canal: 347.4 m Sankuaicuo Bridge reconstruction: 1 bridge Farm road widening: 134 m Flood prevention road (6 m width): 183 m ","innovation":"","good":"","transportation":"","contact":"","picList":[{"picName":"濁幹線多功能調蓄池工程(第二期)-三塊厝橋改建","picURL":"https://www.ia.gov.tw/en/fapi/ArtPic?id=18176\u0026type=EngineeringPic\u0026w=1280\u0026h=720"}]},{"name":"Nanhe No. 1 Canal Improvement Project, Section 1K\u002B210 to 425","design":null,"organizer":"Hsinchu Management Office","supervision":null,"contract":null,"startTime":"2021-03-31T00:00:00","endTime":"2021-09-03T00:00:00","content":"Underground culvert works: 169 m Weather-resistant steel aqueduct: 20 m Sediment discharge passage: 1 location Irrigation ditch: 26 m","innovation":"","good":"","transportation":"","contact":"","picList":[{"picName":"地下涵管推進工程","picURL":"https://www.ia.gov.tw/en/fapi/ArtPic?id=17758\u0026type=EngineeringPic\u0026w=1280\u0026h=720"}]},{"name":"Chishang Canal Main Line 1 Irrigation System Improvement Project (Phase 4)","design":null,"organizer":"Taitung Management Office","supervision":null,"contract":null,"startTime":"2020-07-09T00:00:00","endTime":"2020-12-16T00:00:00","content":"Ecological ditch: 240 m; plantings: 1,690 plants; art installations: 2 units; centipede grass planting: 250 m²; faux wood railing: 273 m.","innovation":"","good":"","transportation":"","contact":"","picList":[{"picName":"池上圳幹","picURL":"https://www.ia.gov.tw/en/fapi/ArtPic?id=18166\u0026type=EngineeringPic\u0026w=1280\u0026h=720"}]}]}